PARMA: Angarsk smart grid and substation 388 control system
Monitoring and control of a city network's transformer substations, and digital relay protection integrated into SCADA at a 35/6 kV substation.
| Years | 2011–2012 |
|---|---|
| Client | PARMA LLC (St Petersburg), maker of measuring transducers and recorders |
| Location | Angarsk, Irkutsk region; St Petersburg, Russia |
| Role | Lead designer of process control and telemetry, commissioning engineer (contract) |

Challenge
Angarsk. Under a smart-grid specification, the city distribution network had to become observable and controllable down to its 6–10/0.4 kV transformer substations: 49 substations, each with two transformers and up to 16 outgoing 0.4 kV lines, plus street-lighting boards. Dispatchers needed currents, voltages, power and alarms per feeder, control of street lighting, and intrusion and fire alarms — without laying new communication cables.
Substation 388. At a 35/6 kV substation with Hungarian EuroProt digital protection relays (DTI-EP, DTD2-EP, DTU10-EP), protection signals, measurements and breaker positions had to be collected in ClearSCADA and sent to the substation server and the regional dispatch centre over IEC 60870-5-101/104.
Solution
Angarsk — a two-level substation monitoring and control system. Field level: a PARMA T400 multifunction transducer on every 0.4 kV feeder (currents, voltages, active and reactive power, frequency), class 0.5S current transformers, a Prosoft-Systems MMT5.1 telemetry controller (RS-232/485, Ethernet, GPS, 8 DI, 8 AI) with GPRS, a TS-32 command module for street lighting, a PARMA UAChR local emergency automation unit, volume and fire sensors, and a UPS. IEC 60870-5-101 inside the substation and event-driven IEC 60870-5-104 to the centre: data is sent on change, cutting traffic and link cost. Top level — a network control centre with redundant dispatch servers, operator workstations, a video wall, TTK-Baikal fibre and an internet provider as backup. Delivered an information model, general technical solutions, a dispatch-room plan, a 42U communications rack and a per-substation bill of materials (about RUB 343k per substation in stage one).
Substation 388 — a test rig and ClearSCADA project: three EP relays connected to a DCS concentrator and on through MOXA NPort servers to the substation and dispatch-centre servers, with T400, OWEN and a Ritom recorder on the same network. Produced the memory map and telemetry table with IEC 60870-5-101/104 object addresses, the relay-settings map and the structural diagram.
My part
Surveys of substations and lighting boards, general solutions and the field-level design, information model and structural diagrams, control centre and communications rack, bills of materials and cost estimate. Bench tests of MMT5 ↔ T400: found incompatible IEC 60870-5-101 implementations, organised joint debugging by PARMA and Prosoft-Systems programmers and sniffed the serial exchange. At substation 388 — the ClearSCADA project, configuration, memory map and addressing, protocol debugging with the EP relays (master/slave modes) and correspondence with the Hungarian manufacturer.
Outcome
General solutions and design of the monitoring system for 49 Angarsk substations with a staged bill of materials; IEC 60870-5-104 agreed with the dispatch service. At substation 388 the 'protection relays — SCADA — dispatch server' rig was built and debugged, and telemetry tables were prepared for SCADA configuration.