Boiler houses for St Peter’s and Kerlogue nursing homes (Eco Life)
One operator panel for boilers, heat pumps and building heating circuits.
| Years | 2021–2022 |
|---|---|
| Client | St Peter’s Nursing Home, Kerlogue Nursing Home |
| Location | Ireland |
| Role | PLC and HMI developer |

Challenge
Control boilers, heat pumps and the heating circuits of several buildings from one system.
Solution
Unitronics program: boiler schedules, PID temperature control, Modbus polling of electricity meters, HMI with trends and per-building statistics.
My part
Controller program, HMI screens, commissioning.
Outcome
Both sites in operation; in 2023 the Kerlogue project was restored after a virus attack on the site network.

