Aleksandr Sidorov
← All projects

R&D: BioGenProcessor biogenic generator

A self-sufficient pyrolysis boiler that turns bio-waste into biochar and generates its own electricity.

R&DPyrolysisDigital twinSimulinkPLC/HMI
Years2018–2021
ClientWoodco Renewable Energy
LocationIreland
RoleElectrical and automation engineer (with process engineer Declan Crosse)
BioGenProcessor 3D model
BioGenProcessor 3D model

Challenge

Build a standalone unit that converts sludge and bio-waste into biochar and powers itself through an Organic Rankine Cycle.

Solution

Process scheme and cycle chart; a dynamic boiler model in MATLAB/Simulink connected to the PLC over Modbus TCP as a digital twin; cabinet on Unitronics, Finder, ABB, Wago, Phoenix Contact, Rittal; HMI and web interface.

My part

The control system from scratch in one year: concept, simulation, EPLAN schematics, cabinet build, PLC and HMI programs, testing, documentation.

Outcome

Prototype built and series production started; laboratory tests for efficiency and emissions. Fixed in 3 months an ORC generator start-up failure the manufacturer had not solved for several years.

Images

Process scheme of the unit
Process scheme of the unit
Operating cycle chart
Operating cycle chart
HMI: boiler, ORC generator, heat and electric output
HMI: boiler, ORC generator, heat and electric output
Prototype control cabinet
Prototype control cabinet