Murmansk Smart Grid and remote control of the Suna and Paz hydro cascades
Telemetry for 200 0.4 kV substations with a dispatch centre and remote control of eight hydro plants.
| Years | 2013–2017 |
|---|---|
| Client | TGC-1 PJSC (Kola and Karelia branches), IDGC of North-West |
| Location | Murmansk region and Karelia, Russia |
| Role | CTO, NPO Systema |
Challenge
Bring 200 0.4 kV substations in Murmansk under remote monitoring from a dispatch centre and put eight plants of the Suna (63.7 MW) and Paz (276 MW) cascades under remote control.
Solution
Substations received measuring transducers and telemetry controllers; data travel to the dispatch centre over IEC 60870-5-104. For the hydro plants the control boards were surveyed and standard remote-control designs produced; data-acquisition systems on ENIP-3 transducers for the Tumanka, Murmashi and Murmansk substations followed in 2013.
My part
Technical solutions that won the tenders, design and commissioning management, budget and schedule control, negotiations with the clients' technical management.
Outcome
A Smart Grid dispatch centre covering 200 substations; eight hydro plants under remote control; all work delivered on the agreed dates.