Aleksandr Sidorov
← All projects

Telemetry for gas-turbine CHP plants and substations

An in-house telemetry system built to grid-operator rules: redundant links, servers, commercial metering.

TelemetryClearSCADAIEC 60870-5-104Cisco
Years2008–2010
ClientEnergomash (UK) Ltd; sites in Velsk, Krymsk, Revda, Veliky Novgorod, Vsevolozhsk, Saransk
LocationRussia
RoleTelemetry project team lead
Telemetry block diagram, Velsk: two channels to the Arkhangelsk dispatch office
Telemetry block diagram, Velsk: two channels to the Arkhangelsk dispatch office

Challenge

Send data from gas-turbine CHP plants and substations to regional dispatch offices in line with their technical requirements.

Solution

Redundant design: two Cisco routers and two links from different carriers to the dispatch office, two telemetry servers, MOXA switches, GPS time sync, polling of commercial meters. ClearSCADA with IEC 60870-5-101/104, Modbus, DNP3, OPC and SNMP; servers virtualised on VMware ESXi.

My part

Block diagrams, bills of materials, ClearSCADA programming, commissioning, plus CCTV, communications and access control at the plants.

Outcome

A standard telemetry package deployed at plants in several regions, reporting to the dispatch offices over two independent links.

Images

Telemetry block diagram, Krymsk
Telemetry block diagram, Krymsk
Telemetry block diagram, Revda
Telemetry block diagram, Revda