Telemetry for gas-turbine CHP plants and substations
An in-house telemetry system built to grid-operator rules: redundant links, servers, commercial metering.
| Years | 2008–2010 |
|---|---|
| Client | Energomash (UK) Ltd; sites in Velsk, Krymsk, Revda, Veliky Novgorod, Vsevolozhsk, Saransk |
| Location | Russia |
| Role | Telemetry project team lead |

Challenge
Send data from gas-turbine CHP plants and substations to regional dispatch offices in line with their technical requirements.
Solution
Redundant design: two Cisco routers and two links from different carriers to the dispatch office, two telemetry servers, MOXA switches, GPS time sync, polling of commercial meters. ClearSCADA with IEC 60870-5-101/104, Modbus, DNP3, OPC and SNMP; servers virtualised on VMware ESXi.
My part
Block diagrams, bills of materials, ClearSCADA programming, commissioning, plus CCTV, communications and access control at the plants.
Outcome
A standard telemetry package deployed at plants in several regions, reporting to the dispatch offices over two independent links.